Dublin Airport

Terminal 2 Temporary Works Screens

Project Outline

Having approached Base structures about a similar scheme at the outset of the works, Dublin Airport came back to us in October 2008 with a proposal to close off the southern elevation of the building with two and a half thousand square metres of weatherproof fabric. 

Dublin Airport

Our Solution

After receiving the brief Base set about designing, manufacturing and installing this completely bespoke and fully engineered solution in less then seven weeks, with the site install time barely exceeding two of these. 

 

Results

This speed of service, combined with the durability, weatherproofing and reliability of the installed scheme enabled the construction team to recover time on the €609m project and made a significant contribution towards completion on the May 2010 deadline.

Dublin Airport Terminal 2 temporary works screening protects the facilities and speeds up the works programme
Dublin Airport Terminal 2 temporary works screening protects the facilities and speeds up the works programme
Dublin Airport Terminal 2 temporary works screening protects the facilities and speeds up the works programme
Dublin Airport Terminal 2 temporary works screening protects the facilities and speeds up the works programme

Project Summary

Client
Dublin Airport
Location
Dublin Airport, Republic Of Ireland
Date
2008
Contractor
Martifer Construction
Fabric
PVC
Product
Temporary Works
Services
Design
Design
Project Management
Project Management
Manufacturing
Manufacturing
Installation
Installation
Maintenance
Maintenance