2008
Dublin Airport
Client
Dublin Airport
Location
Dublin
Contractor
Martifer Construction Ltd
Client
Dublin Airport
Location
Dublin
Contractor
Martifer Construction Ltd
Project Details
Fabric
- PVC
Terminal 2 Temporary Works Screens
Having approached Base structures about a similar scheme at the outset of the works, Dublin Airport came back to us in October 2008 with a proposal to close off the southern elevation of the building with two and a half thousand square metres of weatherproof fabric.


Our Solution
After receiving the brief Base set about designing, manufacturing and installing this completely bespoke and fully engineered solution in less then seven weeks, with the site install time barely exceeding two of these.
The results
This speed of service, combined with the durability, weatherproofing and reliability of the installed scheme enabled the construction team to recover time on the €609m project and made a significant contribution towards completion on the May 2010 deadline.