St John's Beacon

Extreme Durability Printed Banner System

Our client asked us to design, fabricate and install a banner system that would be able to withstand the extreme weather systems at the top of this 150m high tower, adjacent to the Irish sea. The banners are supported on an aluminium system fixed back to the structure via a steel sub frame. 

We designed, engineered and installed this system then manufactured and installed the fabric banners. This solution has worked well. Working at such a height required top notch rope access operatives, who did a great job. Albeit a scary thought for most of us, they thoroughly enjoyed it. 

Project Summary

Client
Bau Media
Location
City Centre, Liverpool
Date
2003
Fabric
PVC
Product
Fabric Facades
Unique Solutions
Services
Design
Design
Project Management
Project Management
Manufacturing
Manufacturing
Installation
Installation
Maintenance
Maintenance