National Exhibition Centre

3 Dimensional Fabric Facade and Printed Over-Cladding

We were approached by the NEC to give the exteriors of Halls 1 and 5 an exciting new look as part of their strategic transformation called ‘project face-lift’.

The project consists of a series of translucent fabric pyramids inter-spaced with dramatic printed fabric panels. On the steel frame forming the pyramids we installed colour change LED back-lighting to allow the client to develop a series of pre-programmed light shows.

The graphics are the largest example in the UK of a specialist long life printing technique developed specifically for architectural use.

National Exhibition Centre

It was a challenging programme for the installation team, with a deadline of completion before the start of the Autumn show season. The project took only 5 months from design through to installation. Our client was delighted that we finished a week ahead of schedule and on budget. This was largely achieved due to the proactive client team and the support of our regular subcontractors.

With the addition of the Bear Grylls Adventure Centre, a Casino, Conference Centre and two new Hotels the NEC is gearing up to be a major destination in the UK.

Project Summary

Client
National Exhibition Centre
Location
NEC, Birmingham
Date
2018
Architect
Acivico Ltd
Fabric
PVC
Product
Unique Solutions
Fabric Cladding
Services
Design
Design
Project Management
Project Management
Manufacturing
Manufacturing
Installation
Installation