Liverpool Biomass

Fabric Clad Warehouse for Biomass Storage

Project Outline

Big enough to become Liverpool’s third cathedral, the latest addition to EON’s Liverpool Bulk Terminal is a massive fabric clad warehouse measuring 65m wide, 170m long and 34m to the apex which to store wood chip and biomass to feed their newly converted Ironbridge Power Station.

Liverpool Biomass

Our Solution

Why tensile fabric? As a warehouse cladding material, it requires less supporting steel than traditional alternatives, making it faster to build as well as being more commercially competitive. In this case, the principle factor was the risk of water ingress affecting the stored biomass. The tensile fabric allows installers to create a sealed environment, thereby minimising the risk to the supply of fuel for the power station.

 

Base Structures designed and manufactured over 22,000m² of tensile fabric covers to fit the skeleton steel structure designed and installed by the UK division of De Boer Structures, an international supplier of turnkey temporary or semi-permanent structures for events and commercial applications. The warehouse will be used to store around 65,000 tonnes of biomass fuel with the electricity generated being used to power 250,000 homes. In addition to designing and manufacturing the grey, white and blue PVC covers, Base also provided specialist roped access personnel to assist with key elements of the installation procedure.

 

Interior of fabric clad warehouse for storing biomass by De Boer
Fabric cladding covered warehouse for storing biomass in Liverpool
Liverpool Biomass fabric cladding warehouse
fabric clad warehouse

Project Summary

Client
EON
Location
Liverpool
Date
2013
Contractor
De Boer Structures
Fabric
PVC
Product
Bespoke Tensile Fabric Structures
Services
Design
Design
Project Management
Project Management
Manufacturing
Manufacturing
Installation
Installation
Maintenance
Maintenance