Kings Waterfront

Fabric Mesh Cladding

Project Outline

Architects, Wilkinson Eyre needed a striking and cost effective method of cladding the focal part of this major new dockside venue. The scheme consisted of 48 tensile fabric panels up to 9.5m high running a total of 150m. 

Kings Waterfront

Our Solution

The project included the fitting of first fix steel beams and brackets to provide mounting positions curved in two planes.

 

Results

The fabric mesh banners were printed with a geometric pattern that mirrored the external cladding and had to be mounted in perfect alignment. Bovis Lend Lease commented on the professional delivery of the project. 



Interior fabric cladding
Kings waterfront fabric cladding
Fabric mesh cladding kings waterfront

Project Summary

Client
Kings Waterfront
Location
Liverpool
Date
2007
Architect
Wilkinson Eyre
Contractor
Bovis Lend Lease Ltd
Fabric
PVC Mesh
Product
Interior Fabric Structures
Services
Design
Design
Project Management
Project Management
Manufacturing
Manufacturing
Installation
Installation
Maintenance
Maintenance