Project Outline

Following the recent successful commissioning of our 250m3 Biogas Holder at Much Fawley Farm near Hereford, we are pleased to show here our latest installation of a 25m3 holder at Alderley Edge in Cheshire. 

Alderley Edge

Our Solution

Due to the simplicity of our design the installation took just 5 hours from our fully trained and qualified staff arriving on site; to commissioning; and finally the all-important customer sign-off gained before our installers leave the site. This holder incorporates our latest design features including a Services Interface Panel which we have added to simplify the connection between our works and the customers supply, and an integral Pressure Relief Valve which protects the system from over pressurisation. Through close consultation with our client during the specification phase, we determined their delivery pipe diameters for the Methane gas and air, and also their preferred detection method for identifying the volume of Biogas contained within the holder. This early communication enables us to arrive on site with a full set of pre-fitted connections thereby minimising expensive site time, resulting in large cost savings which we are happy to pass on to our customers in our original quoted prices.

biogas holder
biogas holder
fabric biogas holder

Project Summary

Client
Chesterfield Biogas
Location
Alderley Edge, Cheshire
Date
2011
Architect
Biotech Services
Contractor
Biotech Services
Fabric
Environmental
Product
Biogas Storage
Services
Design
Design
Project Management
Project Management
Manufacturing
Manufacturing
Installation
Installation
Maintenance
Maintenance