Base Structures were awarded the contract to design, supply and install the 25,000m2 tensile PVC cover for the Basketball Arena at the London 2012 Games.
During the construction of Terminal 2 at Dublin Airport, programme issues led the contractor to look for ways of progressing internal works before the external cladding had been entirely finished.